Contacts
185-911 Yates Street, Suite# 352 Victoria BC V8V 4Y9 Canada
Call us: 1-778 404 00 50
Get in touch
Close

Contacts

CANADA, Victoria - BC V8V 4Y9
185-911 Yates Street, Suite 352

+1 (778) 404 0050

info@reinventy.com

Environmental Policy

Reinventy Solutions Corp. — Environmental & Sustainability Policy

(Effective 1 May 2025 | Revision 1.0 | Replaces ENV‑POL‑2023‑05)

Mission Statement – Deliver disruptive electrification technologies while achieving net‑zero greenhouse‑gas emissions by 2040 and a circular life‑cycle for all AeroMag™ products.

1 · Purpose & Applicability

This Environmental & Sustainability Policy (“Policy”) defines the principles, objectives, compliance obligations and management systems that govern the environmental performance of Reinventy Solutions Corp. (“Reinventy” or “we”). The Policy applies globally to:

  • All legal entities owned or controlled by Reinventy;

  • Employees, contractors, temporary staff and board members;

  • Suppliers and service providers who manufacture, assemble, test or distribute Reinventy hardware, software or materials;

  • R‑&‑D partners, licensees and customers where Reinventy IP is embedded.

2 · Governance & Responsibility

LevelResponsibilityKey Duties
Board of DirectorsAnnual review of ESG KPIs, approve budget & targetsRatify net‑zero roadmap, oversee risk register
Chief Sustainability Officer (CSO)Reports to CEO, chairs EMS Steering CommitteeImplement ISO 14001 system, publish Sustainability Report
Site General ManagersFacility‑level EMS, permits, EPR reportingMaintain legal register, emergency preparedness
Eco‑Champions (per site)Employee engagement, data collectionMonthly KPI reporting, awareness training

The EMS (Environmental Management System) is certified to ISO 14001:2015 and audited by a third‑party registrar (DNV‑GL). KPI assurance is externally verified to ISO 14064‑1:2018.

3 · Legal & Voluntary Framework

Reinventy commits to comply with or exceed the following frameworks and regulations:

  • Canada – Canadian Environmental Protection Act (CEPA), ECCC NPRI, Provincial EPR regs.

  • United States – EPA TSCA §6(h), Clean Air Act §112, Conflict Minerals Rule 17 CFR 240.13p‑1.

  • European Union / EEA – REACH Reg. (EC) 1907/2006, RoHS (EU) 2011/65, WEEE Directive 2012/19, Battery Reg. (EU) 2023/1542, Ecodesign 2023/826.

  • United Kingdom – UK RoHS, ESOS, UK REACH.

  • Japan – Energy Saving Act, PRTR, Act on Rational Use of Energy.

  • People’s Republic of China – MEE RoHS 2 (Order 32), GB/T 16297, PIPL environmental disclosure.

  • International Voluntary – ISO 50001 (energy), Science‑Based Targets initiative (SBTi 1.5 °C path), UN Global Compact, OECD DDG 3TG.

4 · Objectives & Targets (2025–2030)

Objective2025 Baseline2027 Target2030 Target
GHG Scope 1+23 500 tCO₂e−40 %Net‑zero
GHG Scope 3 (Cat.1,11,12)28 000 tCO₂e−25 %−60 %
Renewable electricity45 % global80 %100 %
Waste‑to‑landfill280 t−50 %Zero
Water withdrawal (m³/MWh prod.)3.22.41.8
Recycled NdFeB in magnets0 %30 %70 %
Supplier ISO 14001 coverage62 % spend85 %100 %

Targets are reviewed annually; progress is disclosed in the Sustainability Report (GRI 302/305).

5 · Lifecycle & Circularity Strategy

  1. Design for Environment (DfE) – modular, repairable >8/10 iFixit score; VOC‑free coatings; mandatory LCA gate in PLM.

  2. Material Stewardship – soft‑magnetic powder recovery (>95 % yield), closed‑loop copper recycling, cobalt ASM traceability via RMI.

  3. Take‑Back & EPR – customer return scheme for stators/rotors; compliance with WEEE/Battery Reg; reverse‑logistics handled by DHL GoGreen.

  4. End‑of‑Life Processing – partnership with Urban Mining Co. (USA) and Neomagnet Recycling (EU) for NdFeB hydrometallurgical recovery.

6 · Hazardous Substance Control

Reinventy maintains a Substance Management List (SML) aligned with:

  • REACH SVHC (>0.1 % w/w)

  • Proposition 65

  • GADSL, IEC 62474, IMDS

Suppliers must submit full material declarations via IPC‑1752B; failure triggers non‑conformance procedures.

7 · Energy & Climate Action

  • Scope 1 – Replace R‑410A chillers with R‑454B; switch to green hydrogen for sintering furnaces by 2028.

  • Scope 2 – PPAs for wind (187 GWh/yr) and rooftop solar (4 MWp).

  • Scope 3 – Logistics mode shift 40 % air → sea by 2027; eco‑design reduces magnet mass 20 %.

Carbon accounting follows GHG Protocol with third‑party verification (Lloyd’s Register).

8 · Water & Waste Management

  • Zero‑Liquid‑Discharge (ZLD) system at Vancouver plant; effluent < 10 mg/L COD.

  • Powder overspray collected via HEPA 13 filters; target < 20 ppm airborne Fe fines.

  • Hazardous waste disposed per BCEPA, RCRA Subtitle C.

9 · Supply‑Chain Responsibility

  • All Tier‑1 suppliers must sign the Supplier Code of Environmental Conduct.

  • High‑risk minerals (3TG, cobalt, REE) require OECD DDG alignment and RMAP audit evidence.

  • Annual CSR self‑assessment (SAQ 5.1) and spot audits.

10 · Product Compliance & Labels

  • CE marking per Low‑Voltage + EMC + RoHS.

  • UKCA, FCC Part 15, ICES‑003.

  • China RoHS logo (SJ/T 11364).

  • Energy rating (ErP Lot 30 future).

  • EPREL & DoC hosted online.

11 · Monitoring, Reporting & Verification

  • Monthly KPI dashboard; Eco‑Champions report into CSO.

  • Annual Sustainability Report (GRI Core, SASB RT‑EE) audited by KPMG.

  • Whistle‑blower hotline for environmental concerns (ethics@reinventy‑solutions.ca).

12 · Emergency Preparedness & Response

Detailed SOPs for: metal‑powder spill, lithium‑battery fire, chemical spill (IPA, epoxy), seismic event. Quarterly drills; lessons‑learned tracked in EMS.

13 · Policy Review & Updates

This Policy is reviewed biennially or sooner if triggered by regulatory changes, stakeholder feedback, materiality assessment or significant incident.


Contact

Environmental, Health & Safety Office
Reinventy Solutions Corp. 185 – 911 Yates Street, Suite 352, Victoria, BC V5Y 1C8
Email: ehs@reinventy‑solutions.ca
Phone: +1 778 404 00050

 

Buddy Avatar Ask to Buddy